News & Events

I0282 Return of Legacy Meters

I0282 is a Retail Energy Code (REC) change proposal focused on the challenges associated with the return of non-smart (legacy) electricity meters to Meter Asset Providers (MAPs). As the energy sector transitions to smart metering, thousands—if not millions—of legacy meters are being removed and transported across the country. This process has raised significant questions about cost, environmental impact, and operational efficiency.

Key Issues

  • Cost and Environmental Impact: The transportation and handling of legacy meters incur substantial costs and contribute to environmental concerns due to the scale of logistics involved.
  • Unclear Requirements: It is not always clear whether all MAPs require the return of old meters, leading to potential inefficiencies and unnecessary movements.
  • Recycling and Disposal: There is uncertainty around whether these meters are being recycled, disposed of responsibly, or simply stored. The net value of returning and disposing of old meters remains unclear.
  • Operational Complexity: Storage providers often struggle to identify the original MAPs, especially when company names have changed over time, complicating the process of return and disposal. 

Proposed Solution

The I0282 proposal suggests several improvements:

  • Streamlining the Process: Simplify the return and disposal process to reduce unnecessary transportation and handling.
  • Environmentally Responsible Disposal: Encourage recycling or environmentally friendly disposal of legacy meters, rather than defaulting to return.
  • Clearer Commercial Arrangements: Establish more transparent agreements between parties to clarify responsibilities and reduce costs.
  • Direct Collection by Waste Management: Where possible, allow waste management companies to collect meters directly, bypassing unnecessary steps. 

Industry and Consumer Impact

  • Industry: The proposal primarily affects Distribution Network Operators, Energy Suppliers, MAPs, and Metering Equipment Managers. It references the Consolidated Metering Code of Practice (CoMCoP), which currently requires meters to be returned to MAPs unless alternative arrangements exist.
  • Consumers: No direct impact on consumers is anticipated, but there are potential environmental benefits from improved recycling and disposal practices.

Next Steps

I0282 will be presented by the Code Manager at the next REC Change Issues Group meeting on 04 December 2025 (10:00–12:00). Stakeholders are encouraged to attend and contribute to the discussion on how best to address these challenges and implement more sustainable practices. 

For more information or to participate in the upcoming meeting, please refer to the official REC Portal or contact the Code Manager.

 

REC Portal Relaunch – Stay Connected and Get Involved

The Retail Energy Code (REC) Portal is evolving, and they want you to be part of the journey! The REC Portal Relaunch page on the REC Portal  is your go-to destination for the latest updates on this exciting transformation.

What’s happening?
REC are redesigning the Portal to make it more intuitive, efficient, and aligned with your needs. This is your chance to influence the tools and features you use every day.

Here’s what you can do:

  • Explore what’s new: Check out the latest developments and see how the Portal is shaping up.
  • Join interactive workshops: Share your feedback and ideas directly with the team.
  • Test prototypes: Get hands-on experience with upcoming features and help us refine them.
  • Stay informed: Dip in whenever it suits you and keep close to the work that impacts you most.

Your input matters. Together, we can create a Portal that truly works for you and the wider energy community.

👉 Visit the page now: REC Portal Relaunch – Retail Energy Code Company

New Guidance Released: Managing NHH Meter Technical Details for Reverse Migrated Advanced Metering Points

The Retail Energy Code Company has published new guidance to support Meter Operator Agents (MOAs) and Suppliers in handling Meter Technical Details (MTDs) for Metering Points that have been reverse migrated from the Advanced Market Segment to Non-Half Hourly (NHH) arrangements.

Background

With the Market-wide Half Hourly Settlement (MHHS) migration underway, all electricity Metering Points are expected to transition to MHHS arrangements by 7 May 2027. During this period, some Metering Points initially operating in the Advanced Market Segment may be reverse migrated—particularly if the new Supplier is not MHHS Qualified. In such cases, the Metering Point can be reallocated to the NHH market, requiring the appointed MOA to provide NHH MTDs, even though only Half Hourly (HH) MTDs may have been received as part of the migration process. 

The Reverse Migration Scenario

  • Reverse Migration occurs when a Metering Point, previously operating under MHHS Advanced arrangements, is moved back to legacy NHH arrangements.
  • The Gaining MOA receives the D0268 ‘Advanced Meter Technical Details’ from the Losing MOA.
  • If the new Supplier chooses to operate the Metering Point under NHH (Measurement Class A), the MOA must convert the D0268 into the appropriate NHH market messages:
    • D0149 ‘Notification of Mapping Details’
    • D0150 ‘Traditional Meter Technical Details’
    • D0313 ‘Auxiliary Meter Technical Details’

The Supplier is responsible for informing the Gaining MOA that NHH MTDs are required. Communication methods should be agreed bilaterally, with the D0142 message recommended for requesting changes to the metering system. 

Key Guidance for MOAs

  • D0149 Creation: Mapping details are not included in the D0268. The incoming NHH MOA should interrogate the Advanced Meter to determine or update the setup. If this is not possible, assume a single rate (SSC 0393) with a single register (TPR = 00001).
  • D0150 and D0313 Creation: Most data items can be directly translated from the D0268, but SSC and register details should align with the D0149.

Important Considerations

  • Suppliers should carefully consider the risks of converting Advanced Segment Metering Points back to NHH, especially the accuracy of MTD conversion and the need to migrate these sites back to the Advanced MHHS segment before the next milestone.
  • Reverse migration of Advanced Metering Points is expected to be rare, as most will not migrate to MHHS until April 2026 or later. 

Further Information

New guidance is available on the REC Portal, Population of NHH MTDs when Reverse Migrated from Advanced, to support MOAs and Suppliers in managing this scenario. For more details, visit www.recportal.co.uk or contact enquiries@recmanager.co.uk.

NOW PUBLISHED: IGEM/G/1 Edition 3

The Institution of Gas Engineers & Managers (IGEM) has released IGEM/G/1 Edition 3 – Defining the boundaries between the network, primary meter installation and installation pipework. This latest edition supersedes the 1st, 2nd, and 3rd Impressions and Edition 2 (Communication 1765) of IGEM/G/1.

Download now from the https://www.igem.org.uk.

What’s New?

Previously known as “Defining the end of the network”, this updated technical standard provides a clear framework for the arrangement of:

  • Gas distribution mains
  • Services
  • Primary meter installations
  • Installation pipework

Key Features of IGEM/G/1 Edition 3

  • Clear definitions for boundaries between gas networks, primary meter installations (including any associated meter regulator), and installation pipework.
  • Illustrations of recommended arrangements that reflect current industry practice and simplify future designs, ensuring a safe and secure gas supply.
  • Examples of legacy arrangements that are no longer recommended due to design or layout concerns.
  • Identification of boundaries and interfaces to support accurate information exchange between organisations and individuals with safety responsibilities.

Defining these boundaries and interfaces is critical for maintaining a safe and secure gas supply to premises. It ensures clarity and consistency across the industry, enabling effective collaboration and compliance.

IGEM/G/1 Edition 3 – Defining the boundaries between the Network, primary meter installation and installation pipework | The Institution of Gas Engineers and Managers (IGEM)

AMO/ENA Bilateral Working Group: Driving Collaboration and Innovation in the Energy Sector

On Wednesday, 26 November, industry leaders and key stakeholders gathered in London for the AMO/ENA Bilateral Working Group, marking a significant milestone in collaborative efforts to advance best practices and innovation across the energy sector.

Bringing Together Expertise

The meeting united participants from the Association of Meter Operators (AMO) and the Energy Networks Association (ENA), fostering in-depth discussions on technical challenges, emerging policies, and opportunities for improvement.

Key Technical Discussions

  • MEM Install Data & Service Point Best Practice: Addressing voltage issues across networks and the impact of low-carbon initiatives.
  • Consumer Costs: Exploring whether consumers should bear the cost of fuse downgrades and assessing the suitability of MEM equipment.

Meter Relocation & Asset Condition Reporting

Participants examined best practices for meter relocation and asset condition reporting, including challenges posed by some service points.

Sub-Groups & Emerging Policies

Updates were shared from:

  • STIG Sub Working Group
  • NZ Termination Sub Group

Discussions included near-incident road safety and perceptions of risk.

Minor Interventions & Best Practice

The group explored:

  • Neutral current diversions
  • Emerging DNO policies
    All aimed at driving continuous improvement across the sector.

Quality & Clarity in Documentation

A strong focus was placed on improving clarity and quality in technical documentation, with suggestions for:

  • Enhanced photo standards
  • Improved technical content

Open Forum

The day concluded with an open forum, ensuring all voices were heard and fostering a collaborative atmosphere.

Commitment to Progress

Throughout the event, participants demonstrated a shared commitment to safety, technical excellence, and innovation. The discussions underscored the importance of ongoing collaboration between AMO and ENA, with plans for future meetings and continued engagement on key issues such as:

  • Asset management
  • Technical standards
  • Consumer impact

As the sector evolves, the AMO/ENA Bilateral Working Group stands as a testament to the power of partnership and the drive to make things that matter work better for everyone.

Smart Meter Rollout Hits 70% Milestone Across Great Britain

The rollout of smart meters across Great Britain has reached a major milestone, with new government statistics revealing that 70% of all gas and electricity meters in homes and small businesses are now smart or advanced devices.

According to the latest quarterly report from the Department for Energy Security & Net Zero, more than 40 million smart and advanced meters were in operation by the end of September 2025. Of these, 37 million are actively operating in smart mode, giving consumers real-time insights into their energy usage and enabling more accurate billing.

Installation Pace Slows as Market Matures

During the third quarter of 2025, large energy suppliers installed 680,000 smart and advanced meters—a figure that marks an 8.2% drop compared to the previous quarter and a 4.7% decrease year-on-year. Analysts attribute this slowdown to the increasing saturation of the market, as the majority of properties have already made the switch.

In the domestic sector, 64% of all meters operated by large suppliers are now smart meters in smart mode, with the figure rising to 70% when including those operating in traditional mode. For non-domestic sites, 59% of meters are smart or advanced, rising to 62% when traditional mode is included.

Supporting a Greener, Smarter Energy System

The government describes the smart meter rollout as a “critical national infrastructure upgrade” that supports the transition to a cheaper, cleaner, and more reliable energy system. Smart meters not only help consumers manage their energy use and reduce bills, but also enable the integration of renewable energy sources and flexible tariffs.

The report highlights that the majority of first-generation (SMETS1) meters have now been migrated to the national Data Communications Company (DCC) network, ensuring that customers retain smart functionality even when switching suppliers.

Key Figures at a Glance

  • Total smart/advanced meters installed: 40 million
  • Smart/advanced meters in smart mode: 37 million (64% of all meters)
  • Domestic smart meters installed in Q3 2025: 650,000
  • Non-domestic smart/advanced meters installed in Q3 2025: 26,000
  • Decrease in installations vs. Q2 2025: 8.2%
  • Decrease in installations vs. Q3 2024: 4.7%

Looking Ahead

With the next quarterly update scheduled for March 2026, the focus is expected to shift from installation numbers to maximising the benefits of smart technology—helping consumers save money, supporting decarbonisation, and enabling a more flexible energy grid.

For more details, visit the https://www.gov.uk/government/collections/smart-meters-statistics.

Energy Price Cap to Rise Slightly from January 2026

Ofgem has announced a small increase in the energy price cap for the first quarter of 2026. The change will affect households on default tariffs across England, Scotland, and Wales.

Key Announcement

  • Cap increase: From 1 January to 31 March 2026, the price cap will rise by 0.2%, adding around £0.28 per month for an average dual-fuel household.
  • Annual bill impact: Typical annual bills for Direct Debit customers will be £1,758.
  • Year-on-year comparison: Adjusted for inflation, this is 2% (£37) lower than the same period in 2025.

Why the Change?

The increase is driven by:

  • Government policy and operating costs, including funding for projects like the Sizewell C nuclear plant (around £1/month).
  • Wholesale energy prices, which have stabilised and fallen by 4% in the past three months, though global volatility remains.

Advice for Consumers

The price cap is a safety net, not necessarily the cheapest option. Ofgem recommends:

  • Switching tariffs for better deals.
  • Changing payment method: Moving from standard credit to Direct Debit could save around £136 annually.
  • Prepayment remains the cheapest method, saving around £47 on average.

Support for Struggling Customers

Energy suppliers must provide:

  • Tailored repayment plans.
  • Financial assistance and debt advice.

Unit Rates and Standing Charges

  • Electricity:
    • 27.69p per kWh
    • Standing charge: 54.75p/day
  • Gas:
    • 5.93p per kWh
    • Standing charge: 35.09p/day
      (Rates include VAT and are averages across England, Scotland, and Wales.)

Looking Ahead

Ofgem continues to work with government and industry to:

  • Boost clean energy.
  • Reduce reliance on international markets for energy security.

For full details, visit https://www.ofgem.gov.uk.

 

Ofgem Consults on Strengthening Governance for Energy Suppliers

Ofgem has closed its consultation on new guidance aimed at improving governance arrangements for energy supply licensees. The proposals, published on 30 January 2025, seek to enhance financial resilience and ensure robust decision-making across the retail energy market. Key measures include:

  • Independent oversight and better management of conflicts of interest.
  • Greater transparency in governance structures.
  • Updates to Standard Licence Condition (SLC) 4A on operational capability and SLC 28C on milestone assessments, requiring suppliers to demonstrate governance arrangements that support growth plans.

The regulator favors a principles-based approach but warns that prescriptive rules may follow if outcomes fall short. These steps respond to lessons from supplier failures during 2021–22, aiming to reduce market instability and protect consumers. Stakeholders, including consumer groups and supply licensees, were invited to provide feedback before the consultation closed on 25 April 2025. Ofgem will publish responses and next steps in due course.

Ofgem Launches Statutory Consultation on Harmonised Prioritisation Process for Industry Codes

20 November 2025 – Ofgem has opened a statutory consultation under the Energy Act 2023 to establish a harmonised prioritisation process for modifications across all energy industry codes. This initiative marks a significant step in the ongoing energy code reform programme, aimed at improving governance and aligning code changes with strategic policy objectives.

The consultation seeks stakeholder feedback on proposals to standardise how code modifications are prioritised, ensuring consistency and transparency across the sector. Ofgem’s approach is designed to support the introduction of the Strategic Direction Statement (SDS) and facilitate the transition to reformed governance arrangements.

Key Elements of the Proposal

The consultation focuses on four core policy areas:

  • Prioritisation Process – A unified framework for ranking code modifications.
  • Criteria and Categories – Clear definitions for assessing urgency and impact.
  • Governance – Oversight mechanisms to ensure fair and efficient decision-making.
  • Implementation – Transitional arrangements using powers granted under the Energy Act 2023.

Accompanying the consultation are detailed guidance documents and proposed code text changes (Annexes B–L), along with a notice outlining the legal basis for these reforms.

Why It Matters

Industry codes govern critical aspects of the UK energy system, from market operations to infrastructure development. With increasing complexity and a growing number of modification proposals, a harmonised prioritisation process is seen as essential to manage resources effectively and deliver strategic outcomes, including the transition to a low-carbon economy.

Who Should Respond

Ofgem is inviting responses from:

  • Code administrators and parties
  • Central system delivery bodies
  • Consumer groups
  • Other stakeholders and the public

Responses must be submitted by 12 January 2026 via email to industrycodes@ofgem.gov.uk.

The consultation covers all designated codes and qualifying documents, including:

  • Balancing and Settlement Code (BSC)
  • Connection and Use of System Code (CUSC)
  • Grid Code
  • Distribution Code & DCUSA
  • Retail Energy Code (REC)
  • Smart Energy Code (SEC)
  • Uniform Network Code (UNC)
  • System Operator Transmission Owner Code (STC)
  • Security and Quality of Supply Standard (SQSS). [ofgem.gov.uk]

Next Steps

Following the consultation, Ofgem will review feedback and publish a decision on implementation. Non-confidential responses will be made publicly available to ensure transparency.

For full details and access to consultation documents, visit Ofgem’s official page. [ofgem.gov.uk]

 

New Feature: Filterable Spreadsheet Introduced in CoMCoP Version 3.1

The Consolidated Metering Code of Practice (CoMCoP) sets out the technical and operational standards for metering across the energy industry. It ensures consistency, compliance, and accuracy in metering processes, supporting reliable data for settlement and billing.

The REC code manger has released the latest Consolidated Metering Code of Practice (CoMCoP) Version 3.1, which introduces a significant enhancement for users: a filterable spreadsheet designed to make navigation and data analysis easier than ever.

As part of this update, both the code document and the filterable Excel version of CoMCoP v3.1 are now available within the Operational Documents section of the REC Portal. This improvement aims to streamline access to key information and support operational efficiency across the industry.

Where to Find the Documents

You can access the latest resources through the following sections on the REC Portal:

For reference, previous versions of CoMCoP remain available in the Digital section of the REC Portal under:

  • Consolidated Metering Code of Practice (CoMCoP)

The filterable spreadsheet is designed to help users quickly locate relevant sections, apply custom views, and simplify compliance checks.

 

© Association of Meter Operators 2026 Site by Designamite